News
Aerial Construction Planned
Published: Jun 23, 2020 8:00 am
Work on power lines in Newtown and the area is planned for the period of June 24 through July 4.
The aerial construction will be done from a helicopter. The company that has been contracted to do the work has been in touch with local officials and the FAA for clearance to do the work during that time frame.