Archive
Drying Out Town Hall South
Published: Oct 08, 1999 12:00 am
Drying Out Town Hall South
Jesse Cabral of JC Construction, Inc operates an excavator October 8 at Town Hall South where the town is installing a new curtain drain system to divert groundwater away from the building. The drainage repair project is expected to keep the lower level of the building from becoming wet during periods of high groundwater.                                                 â Bee Photo, Gorosko